国产综合视频图片|亚洲综合爱爱草久久|日韩黄色电影三区四区|成人男女激情福利|国产精品A∨免费观看|日韩免费中文字幕A片|影音先锋中文字幕aV|成人五月激情综合玖玖|国产黄色电影网站|亚洲精品A片无码黄片视频

Baiyinhua No. 3 coal mine dry coal preparation plant, with a design capacity of 6.0mt/a, is built in an open pit, and it takes only 70 days from construction to operation. It is mainly used for the full size separation of residual coal and low calorific value coal in the pit. The calorific value of raw coal is 2958kcal / kg, and the calorific value of cleaned coal after separation is increased to 3524kcal / kg. Dry separation not only improves the calorific value of coal, but also reduces the stock of residual coal and reduces the risk of spontaneous combustion, which has brought huge economic and social benefits to the mine. It is also the largest underground dry coal preparation plant in the world.


ITEM

yield Wt%

ASH Ad% ??

Qnet,ar,Kcal/kg ? NET CALORIFIC VALUE Qnet,ar,Kcal/kg ??

RAW COAL

100

31.55

2937

CLEAN COAL

80.40

18.99

3524

REJECT

19.60

83.08

531


INNER MONGOLIA BAIYINHUA MENGDONG OPEN PIT COAL INDUSTRY CO., LTD

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE