国产综合视频图片|亚洲综合爱爱草久久|日韩黄色电影三区四区|成人男女激情福利|国产精品A∨免费观看|日韩免费中文字幕A片|影音先锋中文字幕aV|成人五月激情综合玖玖|国产黄色电影网站|亚洲精品A片无码黄片视频

Liyuanhe coal mine of Xuangang coal power company built a 2.4mt/a dry process coal preparation plant in 2014. In order to further improve the efficiency of the coal preparation plant and reduce costs, the mine entrusted Shenzhou group to contract and operate in October 2016, so as to realize the high-quality and efficient operation of the coal preparation plant. Since the plant has been operated by Shenzhou, the coal preparation output has increased, the energy consumption has been significantly reduced, the separation accuracy has been greatly improved, and the calorific value of cleaned coal has increased by 1200kcal / kg, which has won the recognition of customers with professional services and achieved mutual benefit and win-win results.


ITEM

yield Wt%

ASH Ad%

Qnet,ar,Kcal/kg ? NET CALORIFIC VALUE Qnet,ar,Kcal/kg

RAW COAL

100

49.29

3525

CLEAN COAL

72.20

37.19

4574

REJECT

27.80

80.73

801

XUANGANG COAL POWER COMPANY OF DATONG COAL MINE GROUP

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE